I also fill the tank with warm water because I have a gas heater. Those with an electric heater will probably prefer warming up the water in the Jobo.
In any event I do wait for the entire chemistry preparation process as the entire system must be heated, the upper tray in particular. Actually I pour the warm water to the upper tray and let it fall into the lower tray, so that upper tray is heated first.
I pour the warm water with all the flasks in their slot.
Then I extract the first flask, mix the first developer, put the flask in the slot, extract the second flask etc.
This way when I finish preparing the sixth bath the first flasks will already have seated in the warm water for enough time to warm up.
I load the film in the tank first. One reason I do that is that I can leave the tank in the Jobo during the warming up phase. I also do it because loading the film in the reel is the only operation that makes me a bit nervous so to speak, I want to have that done before anything else.
During the warming up phase pump and heater are on and rotation is on at the smaller speed, without inversion.
Before operations I activate inversion and set the speed to my typical speed (a little faster than the P position).
In any event I do wait for the entire chemistry preparation process as the entire system must be heated, the upper tray in particular. Actually I pour the warm water to the upper tray and let it fall into the lower tray, so that upper tray is heated first.
I pour the warm water with all the flasks in their slot.
Then I extract the first flask, mix the first developer, put the flask in the slot, extract the second flask etc.
This way when I finish preparing the sixth bath the first flasks will already have seated in the warm water for enough time to warm up.
I load the film in the tank first. One reason I do that is that I can leave the tank in the Jobo during the warming up phase. I also do it because loading the film in the reel is the only operation that makes me a bit nervous so to speak, I want to have that done before anything else.
During the warming up phase pump and heater are on and rotation is on at the smaller speed, without inversion.
Before operations I activate inversion and set the speed to my typical speed (a little faster than the P position).

