ymc226
Member
I usually develop in batches both 120 and 135 up to 20 rolls at a time.
Stand development seems to work for me. I usually have several tanks going (up to 6). Can I, after the developer is poured out and the water stop bath poured in and agitated, leave the water stop bath alone for up to 30 minutes so I can methodically go through each tank using fixer and hypoclear?
Will development still proceed or the emulsion be harmed in any way with leaving the water in the tank undisturbed?
Stand development seems to work for me. I usually have several tanks going (up to 6). Can I, after the developer is poured out and the water stop bath poured in and agitated, leave the water stop bath alone for up to 30 minutes so I can methodically go through each tank using fixer and hypoclear?
Will development still proceed or the emulsion be harmed in any way with leaving the water in the tank undisturbed?