According to the sheet, N-1 is not obtainable and technically, according to the sheet, neither is N+2. Really? You have no insight as to why -1, not to mention -2, is not possible with this data? For +2, looks like the graph could carry out to 17 min, but that same logic can't be used for -2. This is not acceptable. To proceed from here with these results would be quite a limitation IMHO, does anybody disagree? There has to be a reason for such a limitation on the available SBR's that are being shown possible with this data. The curves graph a perfect match with the Excel file I made for myself to input the data for my previous testing, at least the spreadsheet helps me to confirm that.

