I am going to process my first roll of Kodak Tmax 100, 35mm today.
I am using a 2 reel plastic tank.
D-76 developer, 1:1, 12 min.
Kodak indicator stop bath, 1:63, 30 seconds
Kodak powdered fixer
Wash 5 min.
Kodak Photo Flo for the final rinse. 30 sec.
Everything is being done at 68 deg. F.
My question is how long should I fix? The Kodak site says 5-10 min.???
I am using a 2 reel plastic tank.
D-76 developer, 1:1, 12 min.
Kodak indicator stop bath, 1:63, 30 seconds
Kodak powdered fixer
Wash 5 min.
Kodak Photo Flo for the final rinse. 30 sec.
Everything is being done at 68 deg. F.
My question is how long should I fix? The Kodak site says 5-10 min.???

