If I could figure out how to load 2 120 films on a single 120/220 reel I wouldn't have to do this.
I've ordered a customized temperature controller in stainless steel which has a capacity to store 8 1 liter bottles of chemicals (I intend to use this for E6 too). I got quite a bargain and I'm hoping that the product turns out as promised. It has an accuracy of 1/2 degree centigrade. Hopefully this will take my developing to a more accurate level and make it trouble free. At least for C41 and E6. I'll post some pictures when it arrives. Thanks everyone for your feedback and response.
Can you please provide specifics of the controller or a link to the website? TIA!
How does one control the temperature for the crucial developer process in C41?
I've been heating the Patterson film holder so that the heat doesn't dissipate but despite that when I pour the developer at 39 degrees - it shows 37 within a few seconds.
Should I set the developer at 40C and then let it fall to 38? Any ideas?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?