Well, I went ahead and bought it anyway. Talked to the guys in the shop first, apparently it had only been sitting there 4 months or so, he said they reordered around christmas.
Just did my first batch, and they couldn't have gone better. Hanging to dry right now.
Anyway, I learned a few things today:
a) My Jobo blows my earth-leakage breaker on my house. Thankfully, I had a second Jobo lying around so I swapped the lift to that one and it heated up fine, but
b) the second Jobo leaks. So now I gotta go around it with superglue and/or silicon sealant. A towel worked for today but my MDF bathtub-bench isn't happy.
c) The Tetenal kit has some vastly different times to the Jobo instructions
here. I blindly followed the Jobo times (7.30/4/6) and they all look rather good.
So, now I've got some more questions:
I mixed 350ml of a 1L kit, near enough to 1/3rd (I would have done 333ml, but 350ml and the maths/measuring is a lot easier, the 2509n only need 270ml so I'm covered there).
The 1L kit claims 12 rollfims capacity, if I do 2 rolls at once. So I've mixed up chems for 12 / 3 = 4 films.
But I've only put through 4 sheets of 4x5, ie 1-roll capacity.
So the question is, can I get more capacity out of the already-mixed partly-used chems? Even being conservative and expecting half the capacity, I should get another 4 sheets out of this batch, shouldn't I? I'm going back to my shack next weekend to shoot some more, I should do at least 4 shots, maybe 6, so I can dev them in just over a week from now.
I'll also finish a roll in my 617 and may shoot another one or two, but rollfilm lab-dev vs tetenal kit only works out $2-3 more to get it done in a Q-Lab, so I may just lab-dev the rolls and be done with it.
Honestly, I can do two more batches of 325ml each, with 4 or 6 sheets of 4x5. One batch of 4 sheets and the kit has paid for itself compared to a lab, if I do two more batches of 6 I'm definitely ahead, so I'm not concerned about milking too much from this kit, but it would be nice to know what to expect. If I do reuse, do I need any time-compensation in any of the steps?