Hi,
Beginner here. Just processed my first few rolls.
I've just finished fixing the latest roll when I realised I'd made a very stupid mistake in forgetting to get the temperature right.
I realised just as I was finishing off the fixing. Checked the temp and I'm about 18.5 degrees, 1.5 below recommended. So it occurred to me that I'm approx 1min short of correct development time. My question is, before I open and hang to dry is it possible to repeat the whole process ie add developer for 1minute, stop & fix again? If so how long should I stop & fix for?
Thanks
Beginner here. Just processed my first few rolls.
I've just finished fixing the latest roll when I realised I'd made a very stupid mistake in forgetting to get the temperature right.

I realised just as I was finishing off the fixing. Checked the temp and I'm about 18.5 degrees, 1.5 below recommended. So it occurred to me that I'm approx 1min short of correct development time. My question is, before I open and hang to dry is it possible to repeat the whole process ie add developer for 1minute, stop & fix again? If so how long should I stop & fix for?
Thanks

