DanielStone
Member
what's the difference? I've seen both, and seem to remember that Kodak brought out Final Rinse for their re-done color neg films.
PE, can you chime in on this one if you know?
I still have a serious problem with nasty dust particles landing on my 4x5 and 120 negs. Whilst scanning, its a real b!t#h to have to clone all those little dust particles out.
I'll list my order in which i do my processing:
I'm using a Jobo CPP2 with lift arm for 120 and 4x5, also for the small amout of 35mm i do. ALL CHEMISTRY IS KODAK.
1. Heat all chemistry to 39 deg C (102.7 F), the temp that EK recommends for their chemistry and color neg films.
2. Developer for 3:15 (dev is mixed with tap water)
3. Bleach 6:30 (straight use as per Kodak bottle)
4. 1st Wash 4:00 (constant changes of tap water at 95-100 deg F)
5. Fix 6:00 (fix is mixed with tap water)
6. 2nd Wash 4:00 (same as above)
7. Stabilizer 1:30-2:00 (stabilizer is mixed with distilled water)
8. Hang to drip/dry (after 10 mins of dripping, I turn on the drier, which
has a filter)
dry for 45mins or so
leave negs to rest(cool) for 1hr or so and then sleeve
anyone have any pointers?
PE, can you chime in on this one if you know?
I still have a serious problem with nasty dust particles landing on my 4x5 and 120 negs. Whilst scanning, its a real b!t#h to have to clone all those little dust particles out.
I'll list my order in which i do my processing:
I'm using a Jobo CPP2 with lift arm for 120 and 4x5, also for the small amout of 35mm i do. ALL CHEMISTRY IS KODAK.
1. Heat all chemistry to 39 deg C (102.7 F), the temp that EK recommends for their chemistry and color neg films.
2. Developer for 3:15 (dev is mixed with tap water)
3. Bleach 6:30 (straight use as per Kodak bottle)
4. 1st Wash 4:00 (constant changes of tap water at 95-100 deg F)
5. Fix 6:00 (fix is mixed with tap water)
6. 2nd Wash 4:00 (same as above)
7. Stabilizer 1:30-2:00 (stabilizer is mixed with distilled water)
8. Hang to drip/dry (after 10 mins of dripping, I turn on the drier, which
has a filter)
dry for 45mins or so
leave negs to rest(cool) for 1hr or so and then sleeve
anyone have any pointers?