moodlover
Member
- Joined
- May 19, 2015
- Messages
- 229
- Format
- Medium Format
I recently purchased the larger Patterson developing tank that allows you to develop two 120 rolls at once (1000mL total volume). Now, to pour all 1000mL of C-41 developer into this tank takes me about 20-30 seconds. Being that color film is supposed to be developed for 3m30s, how does pouring time affect this?
I start my clock after all the liquid is in, but this means that the roll at the bottom of the tank will have sat in the developer 10-15 seconds longer than the one above it. How should I adjust my development time? Should I begin to pour the developer back out at 3mins or 3m10s and completely empty the tank by 3:30?
I start my clock after all the liquid is in, but this means that the roll at the bottom of the tank will have sat in the developer 10-15 seconds longer than the one above it. How should I adjust my development time? Should I begin to pour the developer back out at 3mins or 3m10s and completely empty the tank by 3:30?