I use a replenished developer and have had no problems adding 22mL of replenisher per roll and replenishing until 1/2 of the original solution volume in replenisher has been added. Still, I think it would be good to have standard test strips that I could develop to verify that developer activity was as it should be. Then I could possibly change my replenishment routine to maintain process stability.
Has anyone ever shot a 35mm roll full of step wedges or something so that you can see if your developer is changing?
I think it would be good to be able to, before developing some important batch of film, to be able to develop a test strip and know your developer was good.
Has anyone ever shot a 35mm roll full of step wedges or something so that you can see if your developer is changing?
I think it would be good to be able to, before developing some important batch of film, to be able to develop a test strip and know your developer was good.

