(*This main post will contain a list of updates)
Hi All,
Our current forum software base (xenforo 1.x) has reached end of life support, so I recently got up to speed on the latest xenforo 2.x and it is, without doubt, the most powerful and flexible forum software I've used. What we can expect from migrating to 2.x is our existing feel but countless improvements (mobile included). Every glitch we currently have or gripe about a broken functionality can be resolved in the new build. I'm working with our freelance coder and so far we've identified around 30 items that need re-coding and porting over to 2.x, and I would say upwards of 50 bug fixes and feature requests to be implemented. This is going to be a huge job and I'll post updates and teasers here when I can. I expect this to take 3 months or so. I'll also be asking for feedback along the way and additional feature requests.
Thanks!
Sean
Updates/Todo:
(dec 11-13th)
-register photrio.dev for new develeopment environment (done)
-setup DNS and web for photrio.dev (done)
-setup SSL (done)
-file copy over photrio.com prod data (done)
-backup photrio.com database (done)
-create .dev database, import prod db (done)
-re-configure photrio.com prod/db copy to function stand alone on photrio.dev (done)
-disable old prod mail routing in dev (done)
-update dev design elements to distinguish it from prod (done)
(dec 17-jan-feb) (all items perfromed in dev)
-download core xenforo update packages
-run through core upgrades
-build out list of all functionality/applications in Photrio 1.0 that needs to be re-coded and deployed in 2.0.
-install core theming and begin building out look and feel
-begin working with freelancers on re-coding apps, functionality and theming from 1.0 to 2.0 (this is the biggest part of the job)
-finish up all functionality aspects of the 2.0 system, hopefully by end of feb.
(march- onward basics)
-test system
-field user feedback and old feature requests + any new feature requests + implement
-test migration
-shut down prod
-run migration
-test if successful
-open site
-monitor for issues and fix anything that arises
Thanks and stay tuned!
Hi All,
Our current forum software base (xenforo 1.x) has reached end of life support, so I recently got up to speed on the latest xenforo 2.x and it is, without doubt, the most powerful and flexible forum software I've used. What we can expect from migrating to 2.x is our existing feel but countless improvements (mobile included). Every glitch we currently have or gripe about a broken functionality can be resolved in the new build. I'm working with our freelance coder and so far we've identified around 30 items that need re-coding and porting over to 2.x, and I would say upwards of 50 bug fixes and feature requests to be implemented. This is going to be a huge job and I'll post updates and teasers here when I can. I expect this to take 3 months or so. I'll also be asking for feedback along the way and additional feature requests.
Thanks!
Sean
Updates/Todo:
(dec 11-13th)
-register photrio.dev for new develeopment environment (done)
-setup DNS and web for photrio.dev (done)
-setup SSL (done)
-file copy over photrio.com prod data (done)
-backup photrio.com database (done)
-create .dev database, import prod db (done)
-re-configure photrio.com prod/db copy to function stand alone on photrio.dev (done)
-disable old prod mail routing in dev (done)
-update dev design elements to distinguish it from prod (done)
(dec 17-jan-feb) (all items perfromed in dev)
-download core xenforo update packages
-run through core upgrades
-build out list of all functionality/applications in Photrio 1.0 that needs to be re-coded and deployed in 2.0.
-install core theming and begin building out look and feel
-begin working with freelancers on re-coding apps, functionality and theming from 1.0 to 2.0 (this is the biggest part of the job)
-finish up all functionality aspects of the 2.0 system, hopefully by end of feb.
(march- onward basics)
-test system
-field user feedback and old feature requests + any new feature requests + implement
-test migration
-shut down prod
-run migration
-test if successful
-open site
-monitor for issues and fix anything that arises
Thanks and stay tuned!